Localized corrosion
Chemistry can attack body, trim, bolting or welds differently.

Critical Service / Corrosive Media
Material, trim and sealing selections for acid, alkali, seawater and aggressive chemical fluids.
Engineering focus
Select the complete wetted system from composition, concentration, pH, chlorides, contaminants, temperature, velocity and cleaning conditions.
Chemistry can attack body, trim, bolting or welds differently.
Mixed wetted materials can accelerate attack.
Seats, packing and gaskets may swell, harden or weaken.
Valve selection
Starting points for engineering review. Final selection depends on the completed process data and project specification.
Best fit: Corrosive duty with proven metallic compatibility.
Engineering focus: Wetted material, welds and corrosion allowance.
Best fit: Strong chemical duty within lining limits.
Engineering focus: Lining continuity, permeation and vacuum resistance.
Best fit: Quarter-turn isolation with compatible soft goods.
Engineering focus: Cavity relief, seats and emission requirements.
Buyer essentials
Send the same completed datasheet to every supplier and require a clear deviations list.
All constituents, concentration, pH and contaminants.
Normal, design, cleaning and upset values.
Velocity, phase, aeration, solids and stagnation.
Body, trim, seat, packing, gasket and bolting.
Rate, allowance, lining and target life.
MTC, PMI, hardness, NDE and lining tests.
Service-specific RFQ data
Standards & verification
Confirm edition, test medium, pressure, duration, leakage acceptance, material traceability and witness points in the purchase order.
Buyer FAQ
No. Concentration, temperature and contaminants change compatibility.
No. Chlorides, acids and crevices can still cause localized attack.
When a compatible lining meets pressure, temperature and permeation limits.
Share the completed datasheet, quantity, destination and delivery target for a practical recommendation and factory quotation.
*Portfolio limits depend on valve type, size, material, pressure-temperature rating and completed engineering review.